Seestrom Floodplain Restoration

Key Project Statement

Located in the lower reach of the Coquille River in Oregon, the Seestrom Floodplain Restoration Project is part of a “working lands” effort to restore tidal floodplain channels and tidal exchange to 300-acres of pastureland. Restoring tidal exchange to pastureland during the off-season for sheep and cattle grazing means that juvenile salmonids can rear in these nutrient rich waters. Waterways completed planning, design, permitting, and construction oversight for this project, which included installing two large box culverts with muted tidal regulators and filling drainage ditches to improve floodplain function and fish habitat.

The Seestrom Tidelands Restoration project included four miles of tidal floodplain channels and box culverts with muted tidal regulators (MTRs) that were constructed in 2019 to restore fish access and tidal flows to a 300-acre working pasture property in the lower reach of the Coquille River, Oregon. During the early 1900s, native forest and tidal floodplains were converted to pasture through clearing and construction of levees, tide gates, and linear drainage ditches. This infrastructure is now falling into disrepair and prevents tidal exchange and fish movement. 

This “working lands'' project balances habitat improvements for fish and other wildlife and agricultural improvements for a local rancher family. Two large concrete box culverts with MTRs allow tidal exchange between the lower Coquille River and historic floodplain, which is now used for cattle pasture. Over four miles of new tidal channels were excavated and drainage ditches were filled, recreating important habitat for juvenile salmonids. 

POST-CONSTRUCTION RESTORED FLOODPLAIN

MUTED-TIDAL REGULATOR AT PHASE 1 CONNECTION TO THE COQUILLE RIVER

This project was made possible due to the cooperation of a local ranching family that will continue  with support from the US Fish and Wildlife Service. Oregon Department of Fish and Wildlife, and the Coquille Watershed Association, Waterways completed a technical feasibility analysis, hydraulic analysis, engineering design, permitting, and construction oversight. Waterways used a 2-D hydraulic model to ensure that the design met geomorphic, hydraulic, and fish passage objectives, and minimized the hydraulic risk to the MTR culverts.

Key Project Information

  • Client

    U.S. Fish and Wildlife Service

  • Services Provided

    Restoration Planning; Land Surveying; Hydrologic and Hydraulic Gauging, Modeling, and Analysis; River and Wetland Restoration Design; Permitting; Civil Design; Construction Support Services

  • Project Manager