Klaskanine Hatchery Fish Passage Improvements
Key Project Statement
The Klaskanine Fish Hatchery is a salmon and steelhead fish hatchery operated by Oregon Department of Fish and Wildlife (ODFW) on the North Fork Klaskanine River in Clatsop County, Oregon. Upstream fish passage was historically blocked at the Ogee Dam to redirect returning adults to the hatchery and to prevent disease vectors from wild fish from impacting the hatchery stock. Two additional dams, located upstream of the Ogee Dam, are used to divert flow to the hatchery for fish raising operations. Waterways completed planning, design, and construction support services for removal of one of the diversion dams and construction of a roughened channel over the dam, which is still used to divert water to the hatchery. These improvements set the stage for now providing fish access to 12 miles of habitat on the North and North North Fork Klaskanine once removal or modification of the Ogee Dam occurs, which is being led by ODFW and is scheduled to occur in the next several years.
ODFW’s Klaskanine Fish Hatchery is located on the North Fork of the Klaskanine River in Clatsop County, Oregon. The hatchery produces a variety of stocks for sport fishing and helps supplement salmon for the gill net fishery out of Youngs Bay. This includes 1.4 million Coho (September-October return), 500,000 Select Area Brights from Rogue egg stocks (Fall return), 2.5 million Tule Chinook (September return time), and approximately 40,000 winter Steelhead. Fish reaching the hatchery, including both wild and hatchery stock, were prevented from moving through the hatchery reach, and upstream, by the presence of multiple intake structures. ODFW and US Fish and Wildlife Service partnered to address fish passage at Intake 2 and Intake 3.
In summer 2021, the concrete channel spanning dam at Intake #2 was demolished along with associated infrastructure. Rock scour protection was constructed adjacent to an existing bridge crossing to stabilize the channel toe and large wood structures were installed to stabilize the bank and improve fish habitat. Waterways completed an existing conditions assessment, topographic survey, hydrologic analysis and hydraulic modeling, alternatives analysis, design, permitting support, and construction support services.
INTAKE 2 POST-CONTRUCTION
INTAKE 3 POST-CONSTRUCTION
In summer 2022, a roughened channel was constructed to provide upstream fish passage for all native migratory fish and life stages of salmonids at Intake 3. Intake 3 is located on the North North Fork of the Klaskanine approximately 80 feet downstream of the Highway 202 crossing. The site consists of a six-foot high channel spanning concrete dam and apron. Waterways completed an existing conditions assessment, topographic survey, hydrologic analysis and hydraulic modeling, alternatives analysis, design, permitting support, and construction support services.
Key Project Information
-
Client
United States Fish and Wildlife Service
-
Services Provided
Fish Passage and Screening; Hydrologic and Hydraulic Gauging, Modeling, and Analysis
-
Project Manager