Trout Creek Restoration Project

Key Project Statement

Trout Creek, a tributary to the Truckee River, flows through Trukee California. Over a century of development has disrupted natural processes, impacting habitat and causing persistent flooding issues. The project will improve the creek’s geomorphic and ecological functions, enhancing aquatic and riparian habitat, improving water quality, providing increased flood protection, and enhancing recreational and aesthetic value. Waterways is leading the design of a multi-phase effort to restore Trout Creek.  Currently, three phases of the project have been constructed totalling approximately 3/4 of a mile of channel.  Two phases of the project remain within a project area that encompasses approximately 1 mile of channel from the Highway 80 crossing to Trout Creek confluence with the Truckee River.

The Town of Truckee partnered with the Truckee River Watershed Council and Truckee Development Corporation in a multi-objective redevelopment project to revitalize the downtown and the adjacent rail yard, reduce flood risks for businesses and residents, and improve the natural environment. The focus of this project is the restoration of Trout Creek, a tributary to the Truckee River, and development of open space that connects residents and visitors of the Truckee area to important natural resources. Waterways has led a team of consultants tasked with enhancing habitat values and functions of Trout Creek.

Downtown development, the railroad, and other land uses from the past 150 years resulted in the channelization and realignment of the Trout Creek channel, upsetting natural channel processes such as bedload movement, habitat creation, hydrology, and riparian connectivity. Despite past efforts to “control” Trout Creek, flooding remained a significant problem. In addition, the biological and aesthetic value of the channel was degraded.

TROUT CREEK REACH 3- POST-CONSTRUCTION

TROUT CREEK REACH 5- POST-CONSTRUCTION

To reverse this trend, Waterways is engaged in a long-term effort to restore Trout Creek, a process that includes multiple design and implementation phases.  The primary project objectives are to:

  • Restore natural geomorphic function to lower Trout Creek and reduce fine sediment loads into the channel,
  • Improve ecological function through riparian corridor restoration and enhancement of aquatic habitat,
  • Improve water quality by treating local runoff from surrounding urban land uses,
  • Provide 100-year flood protection through the project reach,
  • Improve the recreational and aesthetic value of Trout Creek.

The planning phase of the project identified six distinct restoration reaches on Trout Creek in the 1 mile of channel between the Highway 80 crossing and the confluence with the Truckee River.  To date, restoration projects have been implemented in a portion of Reach 1, Reach 2, Reach 3, Reach 4 and Reach 5 in three restoration phases over the past decade.  The most recent phase was constructed in 2022 and included restoration of all of Reaches 4 and 5, a 2,300 foot section of channel.  Waterways’ role in the project included planning, engineering design, assistance with grant application, permitting, construction phase services, and post construction monitoring.

Key Project Information

  • Client

    Town of Truckee

  • Services Provided

    Restoration Planning; Land Surveying; Hydrologic and Hydraulic Gauging, Modeling, and Analysis; River and Wetland Restoration Design; Civil Design; Construction Support Services

  • Project Manager