Santa Cruz, CA
831.421.9291
This email address is being protected from spambots. You need JavaScript enabled to view it.
  Portland, OR
503.227.5979
This email address is being protected from spambots. You need JavaScript enabled to view it.

geyer fullview webClient: Resource Conservation District of Santa Cruz County

Waterways was retained by the Resource Conservation District of Santa Cruz County (RCD) to prepare a sediment source analysis and action plan for the recently acquired Geyer Quarry property. The Land Trust of Santa Cruz County purchased the property in 2008 to provide protection to a portion of the unique and delicate Sandhill ecosystem that extends from Bonny Doon through the Scotts Valley area of the Santa Cruz Mountains. Mining activity, road construction, logging, and off‐highway vehicle (OHV) use have exposed steep, denuded hillslopes in many locations throughout the parcel. These sources of erosion have caused excessive sediment delivery to the San Lorenzo River and its key tributaries (in this case Bean Creek and Zayante Creek) resulting in impacts to salmonid habitat.

manabe-2009Client: City of Watsonville

Waterways staff, with assistance from Biotic Resources Group, designed a wetland restoration project on the Manabe property in Watsonville. The project site included a 25-acre portion of Watsonville Slough, between Highway 1 and Kearney Road located downstream of a large wetland complex adjacent to Ramsey Park that was recently restored in 2005 by the City of Watsonville. The objectives of the project included:

landfilla panClient: City of Watsonville

Waterways staff developed a restoration plan for an area in the Watsonville Slough near Ramsay Park. Initial assessment of the Project Area identified an old landfill adjacent to Ramsay Park as a high priority site to develop plans for restoration project implementation. The Ramsay Park site was part of a larger restoration planning process that identified and prioritized a range of sites in the area (including the landfill site) A complete restoration plan for the Ramsay Park was developed to a level for project implementation. This included a hydrologic and ecologic assessment, a biotic report, wetland delineation, engineering plans, and a design report. The design aimed to create a wetland setting with irregular shorelines, suitable vegetation and natural wetland features that would serve to restore and enhance wildlife habitat and wetland functions on site.

sycamorecreek 3Client: Resource Conservation District of Santa Cruz County

Waterways provided geomorphic assessment, land surveying, and engineering design services for ecological enhancements to a degraded reach of Sycamore Creek, at the confluence with Uvas Creek. The design included recontouring channel banks and the creation of inset floodplain benches to reduce erosion. Native vegetation was established on graded areas. Hydraulic control structures installed at the project included periodic boulder weirs and stilling pools for energy dissipation and a sheetpile cutoff at the project terminus. The detailed grading plan allowed for the retention of mature riparian trees within the project footprint.

photo coldstream webClient: Truckee River Watershed Council & California State Parks

A 2007 geomorphic assessment of the Coldstream Canyon watershed identified opportunities to restore stream and watershed function along the lower one-half mile of Cold Creek, extending upstream from the confluence with Donner Creek. Waterways, in coordination with River Run Consulting, prepared final designs for the restoration of this reach.  Designs included inset floodplain bench excavation, re-contouring of steep banks and log/boulder barb installations to reduce bank erosion and expand and improve riparian habitat.  Waterways and River Run also provided permit support and construction oversight.

syar1 aerialClient: Syar Industries, Inc.

GEOMORPHIC ANALYSIS OF THE MIDDLE REACH OF THE RUSSIAN RIVER
Waterways, in cooperation with Swanson Hydrology and Geomorphology, is in the process of completing a detailed hydraulic, geomorphic and sediment transport analyses for the Russian River’s Middle Reach, near Healdsburg. This work focuses on the effects of in-stream mining and other human activities on channel morphology and flood capacity. A chrono-sequence of topographic surfaces representing the channel and floodplain were analyzed to calculate volumetric changes in channel geometry over the past 20 years. Then, a hydraulic model was constructed along 5 miles of the Russian River to evaluate land use impacts on flood elevations.

pads during constClient: USFS- Lake Tahoe Basin Management Unit

Waterways, in coordination with the USFS Lake Tahoe Basin Management Unit (LTBMU) and Swanson Hydrology, has developed designs to restore the mainstem and tributaries of Cold Creek in the High Meadow Complex (HMC) near South Lake Tahoe, California. The basic restoration objective is to increase soil moisture within approximately 70 acres of meadow area by modifying the morphology and hydrology of the streams in a manner consistent with natural geomorphic processes. Work involves re-constructing approximately 8,700 linear feet of channel and raising the elevation of the streambeds by 2 to 4 feet. The project will significantly increase the diversity and density of meadow wetland vegetation species and shift some areas from seasonally dry and sparse mesic meadows to wet meadow conditions.

The project’s three-year construction plan was completed in 2012, with Waterways providing on-site supervision.

Project Menu

Central California Project Portfolio
Aptos Creek Watershed Assessment and Enhancement Plan
Attiyeh Ranch Conservation Easement
Camp Pico Blanco Fish Ladder and Dam Retrofit
City of Santa Cruz Watershed Management Plan
Corralitos Creek Bank Stabilization
Eureka Canyon Bridge Replacement and Fish Passage Improvements @ Koinonia Conference Center
Fall Creek Fish Ladder
Geyer Quarry Restoration Plan
Mitchell Creek Dam Removals & Fish Passage Improvements
North Monterey County High School Nature Area Design Project
Pajaro River Care Project
Potrero Hills Wetland Mitigation
Quail Hollow Bridge Replacement and Channel Restoration
Salmonid Enhancment Plan for the San Lorenzo River
San Lorenzo River Monitoring
Soquel Creek Floodplain Restoration
Sycamore Creek Bank Stabilization
Valencia Creek Fish Ladder
Watsonville Sloughs Landfill Site Restoration near Ramsay Park
Watsonville Sloughs Manabe Property Wetland Restoration
Watsonville Trails Master Plan
West Valley College Stream and Wetland Enhancement and Riparian Trail Plan
Zayante Area Sediment Source Reduction Plan
Northern Cal-Nevada Project Portfolio
Big Meadow Creek Watershed Assessment
Blackwood Creek Stream Restoration
Cold Creek/ High Meadow Ecosystem Restoration
Coldstream Floodplain Enhancement Project
Edgewood Creek Watershed Assessment, Enhancement Plan, & Restoration
Hat Creek Restoration
Hope Valley Meadow Restoration
Independence Lake Log Cribwall and Fish Barrier Design
Kunzler Ranch Gravel Extraction
Perazzo Meadows Geomorphic Assessment
Russian River Projects
Sonoma County Fish Passage Projects
St. Helena Comprehensive Flood Protection Plan
Trout Creek Restoration
Upper Carson River Watershed Assessment
Pacific Northwest Project Portfolio
Batwater Station Floodplain Enhancement Project
Clackamas County Water Environment Services Action Planning & Geomorphic Monitoring
Dairy Creek- Sturgeon Lake Restoration
East Valley Mine Wetland Mitigation Project
Fox Creek Restoration Plan
Gales Creek Restoration Planning
Gooseneck Creek Restoration
Half Mile Lane Mitigation Bank
Hillsboro Landfill Wetlands Outfall Channel and No-Rise Documentation
Jackson Creek Restoration Plan
Lower Clatskanie Floodplain Restoration
Lower Cottonwood Creek Points of Diversion Modification Projects
Mill Creek Side Channel Restoration
Milton Creek Large Wood Enhancement Project
Murtaugh Creek Fish Passage
North Fork Deep Creek Habitat Enhancement Project
Rinearson Creek Natural Area Restoration
Salmon and Cox Creek Fish Barrier Improvement Project
Scappoose Bay Restoration Plan
South Fork Necanicum Fish Passage Improvement Project
Southern California Project Portfolio
Arroyo Grande Creek Channel Flood Mitigation
Circle G Ranch Fish Passage Improvement
Gobernador Creek Bridge Replacement and Fish Passage Improvements - Widdoes Residence
Morro Fish Review
Pismo Creek Fish Passage Project
Rodriguez Fish Passage Project
Tally Ho Channel Assessment