Coweeman Headwaters Habitat Enhancement Project
Key Project Statement
Waterways has supported the Lower Columbia Fish Enhancement Group to restore hydrologic, geomorphic and ecological processes on over 5 miles of the Coweeman and several of its tributaries through construction of large wood structures. As a result of historic forestry practices, the headwaters of the Coweeman have become incised, limiting available spawning and rearing habitat for salmonids. Large wood, much of which was sourced on site, has been strategically placed to capture and sort sediment, re-aggrading the reach and improving habitat for fisheries and aquatic organisms.
Historic forestry practices and splash damming in the headwaters of the Coweeman removed natural roughness elements and flushed much of the large wood and mobile bed material from the upper reaches. Re-accumulation of wood and gravel has been inhibited by the lack of new recruitment of large, mature conifers that act as key logs capable of creating and maintaining log jams in this high energy environment. As a result, reaches that previously contained mixed bedrock-alluvial channels now flow over bedrock, limiting the quantity of available spawning and rearing habitat. Although the upper watershed contains abundant supplies of cold water and suitable-sized sediment, the limited wood supply and corresponding lack of roughness prevent the accumulation of bed material, limiting the productivity of salmon and steelhead. Erosion down to bedrock along many reaches has also resulted in less frequent access of floodwaters to floodplain areas and associated offchannel overwintering and rearing habitat. To reverse these trends a grant was provided by the Salmon Recovery Funding Board to develop preliminary engineering designs for 5.7 miles of channel on the mainstem Coweeman and two key tributaries, Baird and Skipper Creeks.
A comprehensive approach was developed to enhance gravel storage and reconnect off-channel habitat by using a combination of channel and valley spanning, lateral, and cover habitat focused structures throughout eighteen identified reaches. Much of the wood is being sourced on-site to allow for opportunities to introduce whole trees that would act as key pieces for log jam formation. Log structure locations were determined on a site-specific basis through consideration of existing spawning locations identified by WDFW, bedrock outcrops, adjacent wood supplies, and site access. The project was divided into four phases, given the scale of the effort, with Phase 1 completed in summer 2019, Phase 2 completed in summer 2021, Phase 3 constructed in summer 2022 and Phase 4 completed in summer 2023. Wood structures in Phases 1 through 3 were constructed via heavy equipment, tree tipping, and tree cutting, depending on location. Phase 4 utilized a helicopter to place wood on Baird Creek, a major headwater tributary to the Coweeman River. Waterways role included mapping, site selection, wood sourcing, development of engineering designs, assistance with permitting, and construction phase services.
Key Project Information
-
ClientLower Columbia Fish Enhancement Group
-
Services ProvidedSurveying, Geomorphic Evaluation, Restoration Planning, Engineering Design, Cost Estimating; Bid and Construction Phase Services
-
Project Manager